Nailed floors
Nailed floors on Duofor® Dovetail Plates

Duofor® Dovetail Plates can be attached directly to the beam position when the planking has been removed. There is a free span possible from beam to beam to save height.

The panels should not be bolted but simply nailed through the top profile on each 3 nails per panel width beam. When installing underfloor heating, 2 nails are sufficient per panel width.
 

Nailed on the beam position


When processing the Duofor® Dovetail Plates on a beam layer, the overlap is applied to the beam with a length direction of approx. 100 mm. Dovetail plates are nailed to the top flange and a nailed floor construction is created.